BX88272 Mini Fuse Bypass Switch, Long Lead
$61.00
Chances are you have seen us on the road. That’s because at Blue Ox we design and manufacture the best towing products in the industry. But don’t take our word for it, just look around. You will find us on highways, campgrounds, and anywhere you find people traveling through life in the great outdoors.
Blue Ox has a solution for everything you want to tow. From our award winning tow bars and innovative baseplates to a full line of weight distributing hitches, towing doesn’t have to be a drag. We create all of our products to make towing easier, so you can stay focused on the road ahead and not what’s behind you.
Stop pulling fuses every time you tow. Now you can disconnect your fuse with the flip of a switch.
The Fuse Bypass Switches are available in four (5) different models (see application guide for fit information). This switch provides a safe alternative to the constant removal and reinstallation of the fuse when changing from the towed mode to the driving mode.
WARNING: This product can expose you to chemicals including (LEAD) which is known to the state of California to cause Cancer, Birth Defects, or other Reproductive Harm. For more information go to www.P65warnings.ca.gov